As a trusted supplier of pre-folding folder gluers, I understand the importance of proper installation to ensure optimal performance and longevity of the equipment. In this blog post, I will delve into the essential installation requirements for a pre-folding folder gluer, providing you with a comprehensive guide to help you set up your machine correctly.
1. Site Preparation
Before installing the pre-folding folder gluer, it is crucial to prepare the installation site properly. Here are some key considerations:
Space Requirements
The pre-folding folder gluer requires a sufficient amount of space to operate safely and efficiently. You should measure the dimensions of the machine, including its length, width, and height, and ensure that the installation area is large enough to accommodate it. Additionally, you need to leave enough space around the machine for maintenance, operator access, and material handling. A general rule of thumb is to leave at least 1 - 2 meters of clearance on all sides of the machine.
Floor Conditions
The floor where the pre-folding folder gluer will be installed must be flat, level, and able to support the weight of the machine. Uneven floors can cause the machine to vibrate during operation, which may lead to misalignment, poor performance, and premature wear of components. You can use a spirit level to check the flatness of the floor. If the floor is not level, you may need to use shims or other leveling devices to adjust the machine's position.
The floor should also be strong enough to bear the weight of the pre-folding folder gluer. Heavy machines can exert significant pressure on the floor, and a weak floor may crack or sink over time. You can consult the machine's manual or the manufacturer for the specific floor load requirements. In some cases, you may need to reinforce the floor before installation.
Ventilation
Proper ventilation is essential for the installation of a pre-folding folder gluer. The machine generates heat during operation, and without adequate ventilation, the temperature in the installation area can rise significantly, which may affect the performance of the machine and pose a risk to the operator's health. You should ensure that the installation area has good natural ventilation or install an exhaust system to remove heat and fumes from the area.
2. Electrical Requirements
The pre-folding folder gluer is an electrical device, and it is important to meet the electrical requirements to ensure safe and reliable operation.
Power Supply
The machine requires a stable power supply with the correct voltage and frequency. You should check the machine's manual for the specific power requirements, including the voltage (e.g., 220V, 380V), frequency (e.g., 50Hz, 60Hz), and phase (single-phase or three-phase). Make sure that the power supply in the installation area matches these requirements.
It is also recommended to use a dedicated circuit for the pre-folding folder gluer to avoid overloading the electrical system. A dedicated circuit ensures that the machine receives a consistent power supply and reduces the risk of electrical interference from other devices.
Electrical Wiring
The electrical wiring for the pre-folding folder gluer must be installed by a qualified electrician in accordance with local electrical codes and regulations. The wiring should be of the appropriate gauge to handle the machine's electrical load and should be properly insulated to prevent electrical shocks.
All electrical connections should be secure and free from loose wires or exposed conductors. You should also install a suitable electrical protection device, such as a circuit breaker or a fuse, to protect the machine from electrical faults.
3. Pneumatic Requirements
Many pre-folding folder gluers use pneumatic systems to operate certain components, such as actuators and cylinders. Therefore, it is necessary to meet the pneumatic requirements for proper installation.
Compressed Air Supply
The machine requires a clean, dry, and stable compressed air supply. You should check the machine's manual for the specific air pressure and flow rate requirements. The compressed air should be free from moisture, oil, and dust, as these contaminants can damage the pneumatic components and affect the machine's performance.
To ensure a clean and dry air supply, you can install an air treatment unit, such as an air filter, regulator, and lubricator (FRL unit), between the compressor and the machine. The FRL unit can remove moisture, oil, and dust from the compressed air and regulate the air pressure to the required level.
Pneumatic Tubing
The pneumatic tubing used to connect the machine to the compressed air supply must be of the appropriate size and material. The tubing should be able to withstand the air pressure and should be flexible enough to allow for easy installation and movement of the machine. You should also ensure that the tubing connections are tight and leak-free to prevent air loss.
4. Machine Assembly and Alignment
Once the site preparation, electrical, and pneumatic requirements are met, you can proceed with the machine assembly and alignment.
Assembly
The pre-folding folder gluer usually comes in several parts and needs to be assembled on-site. You should follow the assembly instructions provided in the machine's manual carefully. Make sure that all components are installed correctly and securely, and that all bolts and nuts are tightened to the specified torque.


During the assembly process, you should also check the alignment of the machine's components, such as the conveyor belts, folding plates, and gluing units. Misaligned components can cause problems such as uneven folding, poor gluing, and jams.
Alignment
Proper alignment is crucial for the performance of the pre-folding folder gluer. You can use alignment tools, such as laser alignment devices or feeler gauges, to ensure that the machine's components are aligned correctly. The alignment should be checked in both the horizontal and vertical planes.
The conveyor belts should be aligned parallel to each other to ensure smooth material transfer. The folding plates should be aligned precisely to achieve accurate folding angles. The gluing units should be aligned with the folding path to ensure proper glue application.
5. Testing and Commissioning
After the machine is assembled and aligned, it is necessary to conduct thorough testing and commissioning to ensure that it is operating properly.
Initial Checks
Before starting the machine, you should perform a series of initial checks. Check all the electrical connections, pneumatic tubing, and mechanical components to ensure that they are secure and in good condition. Inspect the machine for any signs of damage or loose parts.
Dry Run
Perform a dry run of the machine without any materials to check the basic functionality of the machine. Start the machine and observe its operation, including the movement of the conveyor belts, folding plates, and gluing units. Check for any abnormal noises, vibrations, or malfunctions.
Material Testing
Once the dry run is successful, you can start testing the machine with actual materials. Feed the materials into the machine and observe the folding and gluing process. Check the quality of the folded and glued cartons, including the folding accuracy, glue adhesion, and overall appearance. Make any necessary adjustments to the machine settings, such as the folding speed, glue application amount, and pressure, to achieve the desired results.
Conclusion
Proper installation of a pre-folding folder gluer is essential for its optimal performance and longevity. By following the installation requirements outlined in this blog post, you can ensure that your machine is installed correctly and operates safely and efficiently.
If you are in the market for a pre-folding folder gluer, we offer a wide range of high-quality products, including the Automatic Carton Folding Gluing Machine, Folder Gluer Machine Pre-folding, and High Speed Pre-Fold Manual Box Gluing Machine. Our team of experts can provide you with professional installation guidance and after-sales support. If you have any questions or would like to discuss your specific requirements, please feel free to contact us for a procurement negotiation.
References
- Manufacturer's manual of the pre-folding folder gluer.
- Industry standards and guidelines for the installation of industrial machinery.